Walton Bridge
Project

Walton Bridge

Location

Walton on Thames

Client

Surrey County Council

Consultant

Atkins

Contractor

Costain

Stage

Complete

Project Description

The new bridge was created to replace two existing temporary bridges, across the River Thames. This was the first bridge to be built over the River Thames for 20 years. EMJ designed and manufactured various length Type 11 & 12 Panels ranging from 2615mm to 3474mm in length also at various widths to suit the design requirements of the bridge. EMJ designed, detailed, manufacture and delivered all the GRP Permadeck panels to site in 6 weeks. EMJ Permadeck panels are used as a safe working platform as the photos indicate.